
The 800V Data Center Shift: How High-Power AI is Changing PCB Materials, DFM, and Testing
As AI data-center power architectures move toward higher-voltage DC distribution, PCB and PCBA teams need to define more than nominal voltage. Working voltage, transient conditions, insulation strategy, materials, thermal path, component margins, inspection, and test acceptance should be clear before quotation or fabrication begins.
Read article
