Request a PCB Assembly or EMS & Box Build quote.
Prepare the files and project requirements needed for a PCB Assembly or EMS & Box Build quotation.
Email the project files and requirements to info@venture-mfg.com. Venture Electronics reviews the available information, identifies missing inputs and confirms the quotation scope before procurement or production begins.

Define the deliverable and supply model
Start with the deliverable, then identify the material supply model. Sourcing, fabrication, BOM/DFM, and testing needs are supporting requirements within that project scope.
| Required deliverable | Supply model | What to include |
|---|---|---|
| Assembled boards (PCB Assembly) | Consigned, kitted, partial-turnkey, or full-turnkey | Gerber or ODB++, BOM, CPL, assembly drawing, quantity, sourcing boundaries, programming, coating, marking, and testing expectations. |
| Product-level assembly (EMS & Box Build) | Define board, enclosure, cable, accessory, and packaging responsibility | System BOM, enclosure and mechanical drawings, cable or harness details, assembly instructions, system-test method, labels, accessories and packaging requirements. |
| Not sure yet | To discuss | Describe the finished result, available files, quantity, sourcing questions, fabrication requirements, testing needs, and delivery destination. |
Email-first RFQ workflow
Email the available Gerber, BOM, CPL, drawings, and project requirements to Venture Electronics. For large or sensitive files, start by email and confirm the preferred transfer method.
Core RFQ files
- Gerber or ODB++ files
- BOM with MPN, manufacturer, quantity, and substitution rules
- CPL / Pick-and-Place data
- Assembly drawing and polarity notes
- Quantity and target schedule
- Testing plan, firmware, fixture, or acceptance criteria when available
- Packaging, labeling, delivery destination, and required shipping documents
Email, NDA and large files
Recommended email subject: RFQ - [Company] - [Project Name]. Include company, contact person, required deliverable, supply model, quantity, target schedule, and delivery destination. For sensitive files, NDA discussion, or large attachments, start by email and ask for the preferred transfer method before sending the full package.
Where to send your RFQ
- Email RFQ files and project details to info@venture-mfg.com.
- Use info@venture-mfg.com for general company or official-channel questions.
- Include company name, contact person, required deliverable, supply model, quantity, target schedule, and delivery expectations.
- For large files, NDA discussion, or sensitive documents, start by email and ask for the preferred transfer method.
RFQ email FAQ
How should I send RFQ files?
Email the available RFQ package to Venture Electronics, or start by email to confirm the preferred transfer method for large or sensitive files.
Which email should receive RFQ files?
Send RFQ files, project details, and general company or channel questions to info@venture-mfg.com.
What should the RFQ email include?
Include company name, contact person, required deliverable, supply model, quantity, target schedule, delivery expectations, and the current file package.
What happens next
- 01We review the files and check whether the project scope is clear enough for quoting.
- 02The team may ask for missing BOM fields, drawings, test steps, sourcing restrictions, or packaging requirements.
- 03Quoted scope, substitutions, testing, schedule, and delivery details should be confirmed before procurement or assembly starts.
